Chikugo River Weir

Chikugo River Weir is a major water-control facility built across the main stream of the Chikugo River, approximately 23 kilometers upstream from its mouth. It spans the area between Kurume City in Fukuoka Prefecture and Miyaki Town in Saga Prefecture. Designed to support both flood control and water supply, the weir plays an important role in the lives and industries of communities throughout the region.

An Important Infrastructure Facility Supporting the Region

Managed by the Japan Water Agency, Chikugo River Weir is a movable weir constructed to regulate the Chikugo River and secure a stable water supply for the Fukuoka and Chikugo regions, as well as Saga Prefecture. It was developed under the Chikugo River System Water Resources Development Basic Plan and serves functions similar to those of a multipurpose dam.

Background and History of Construction

The construction of Chikugo River Weir was considered as part of broader flood-control measures following the devastating floods that struck western Japan in 1953. In response to this disaster, the Economic Stabilization Board formulated the Chikugo River System Basic Flood-Control Plan, which called for improvements to flood protection along the middle and lower reaches of the river. As additional facilities were needed to manage floodwaters, the construction of the weir became an important part of the plan.

At the same time, population growth in cities such as Fukuoka, Kurume, and Saga led to a rapid increase in demand for water. The Ministry of Agriculture and Forestry was also carrying out the National Chikugo River Lower Reaches Land Improvement Project, which required a dependable source of water. Securing sufficient water resources for households, industry, and agriculture therefore became an increasingly important regional issue.

The Weir’s Purpose and Water Supply Functions

One of the main purposes of Chikugo River Weir is to regulate river flows during periods of heavy rainfall and reduce the risk of flooding. It also helps provide a stable supply of water for daily life and economic activities. The weir is 13.8 meters high. Its construction was planned in 1974, and the facility was completed in 1985.

Through this water infrastructure, tap water is supplied to nine cities and nine towns and villages, including Fukuoka City, Dazaifu City, and Chikushino City. Industrial and agricultural water is also provided to areas including Kurume City and Omuta City. Saga City and surrounding municipalities likewise benefit from the water supply, making the weir an important part of the region’s water infrastructure.

Contribution to the Eradication of Schistosomiasis

The construction project was accompanied by measures to eradicate schistosomiasis, a parasitic disease historically associated with certain freshwater environments. Improvements to wetlands and riverbanks helped eliminate habitats for the Japanese freshwater snail, which acts as an intermediate host for the parasite. In 1990, an official declaration was issued stating that the area was safe from the disease.

These efforts demonstrate that the project was not limited to flood prevention and water supply. Improvements to the surrounding river environment also formed part of its wider contribution to regional public health.

Negotiations with the Fishing Industry

The construction of Chikugo River Weir was not without controversy. Fisheries cooperatives engaged in nori seaweed cultivation in the Ariake Sea strongly opposed the project because they feared that the weir would reduce the amount of freshwater flowing downstream. They were concerned that changes in river discharge could adversely affect the growth of nori, an important local aquaculture product.

In 1978, opposition meetings were held, and protests took place when construction began the following year. Work started in April 1979 but was temporarily suspended because of opposition from the fisheries cooperatives.

Agreements and Measures to Reduce the Impact on Nori Cultivation

Following further major flooding, the parties began to seek common ground. In November 1980, a basic agreement was reached between the relevant parties. To reduce the impact on nori cultivation, the agreement required a minimum volume of water to be released downstream during periods of low river flow.

The former Ministry of Construction, now the Ministry of Land, Infrastructure, Transport and Tourism, and Kyushu Electric Power Company also cooperated in implementing additional measures. These included redevelopment projects involving Matsubara Dam and Shimouke Dam, intended to help minimize the effects on the nori fishing industry. The fisheries compensation issue was finally resolved in 1984, and the source article reports that nori cultivation has not experienced major adverse effects from the weir.

A Continuing Role in Water and Environmental Management

Chikugo River Weir performs an important role in both flood control and water utilization. During floods, it helps regulate the volume of water in the river and protect surrounding communities. Under normal conditions, it supports a stable supply of drinking water, industrial water, and agricultural water.

Its construction and associated environmental improvements also contributed to the campaign against schistosomiasis. The history of the project illustrates how large-scale water infrastructure can involve not only engineering and regional development, but also environmental protection and negotiations with people whose livelihoods depend on the river and the sea.

Dialogue with local residents and fishing communities was an important part of resolving the challenges surrounding the project. Chikugo River Weir continues to serve as a key facility for managing water resources and supporting the communities of the Chikugo River basin.